C-Smart 500×500mm Outdoor LED Screen
Pixel Pitch:
P3.91
Dimension:
500×500 mm (Module)
Features:
Integrated Module Structure
Flexible Frame Installation
Front & Rear Maintenance
Netherlands Warehouse Stock
Check an LED display
To check CE documentation for an LED display, start with the exact product and configuration on the quotation. Trace that identity through the EU Declaration of Conformity, the supporting assessment evidence and the product label. Establish which EU rules apply before deciding whether a particular report, standard or third-party assessment is required. A CE logo or a generic “CE certificate” alone is not enough to complete that check.
This guide is for EU buyers and integrators comparing offers before an order. It helps you organise an evidence review; it does not certify a product or replace a conformity assessment. No Chipshow model is described here as verified without its actual documentation being examined.
CE marking is the manufacturer’s declaration that the product meets the applicable EU requirements that provide for the marking. It is not an EU agency’s product recommendation, a general quality award, or one certificate covering everything a brand sells. The EU’s official CE marking overview explains the manufacturer’s responsibility for conformity, technical documentation and the signed declaration.
A useful review separates three questions:
On a small screen, scroll the table horizontally to see every column.
| Question | Evidence to examine | What it does not prove on its own |
|---|---|---|
| Who declares conformity, and for what product? | Signed EU Declaration of Conformity identifying the product and responsible manufacturer | That every model in the catalogue is covered |
| How was conformity established? | Applicable assessment route and supporting technical evidence, such as reports and documented design assessment | That a laboratory logo or a report title covers your exact build |
| Is this the product being supplied? | Quotation, configuration record and product label/model identification | That a matching brand name means the hardware is unchanged |
The goal is traceability across all three—not simply accumulating more PDFs.
Ask whether the quotation is for a module, a cabinet, a complete display system or an installed assembly. Record the model and revision, power supplies, controller, intended indoor/outdoor use and any radio functionality. A report on one component is not automatically evidence for the complete system.
For example, the Low Voltage Directive overview describes its voltage scope as 50–1,000 V AC or 75–1,500 V DC. A low-voltage LED module and a mains-powered finished cabinet therefore need a scope assessment; they should not be treated as the same product just because both are called an “LED display.” Being outside one directive’s voltage scope does not remove other potentially applicable requirements.
Use the following as a discussion map, not a universal declaration template:
A list of impressive-sounding standards is not a substitute for this scope decision.
Check the declaration for product identification, manufacturer name and address, applicable EU legislation, referenced standards or specifications, and the signatory details, place and date required by the applicable legislation.
Where the offered model is covered by a family declaration, request a clear definition of that family and how the offered configuration fits it. A different suffix is a question to resolve—not automatic proof of either compliance or non-compliance.
Illustrative document check—not a real supplier case: a quotation says “Display-X Outdoor Rev B,” while a report describes “Display-X Indoor Rev A.” Do not close the review because the base name matches. Ask for the differences between the builds, the scope of the declaration, and the assessment supporting coverage of the outdoor revision. Put the answer and supporting document references in the procurement file.
Then compare the actual product identification on the label with the paperwork. The CE symbol is not a model identifier; model, serial or other traceability information must be checked separately from the appearance of the mark.
Not every CE-marked product requires a notified body or a third-party laboratory certificate. The conformity-assessment procedure depends on the legislation. The Commission’s LVD overview, for example, states that a notified body is not required for that directive. The EU CE overview explains when assessment by the manufacturer is permitted and when a notified body is needed.
An independent test report can still be valuable procurement evidence. If you require an accredited laboratory, identify that as a contractual criterion unless the applicable legal route makes it mandatory. Check the laboratory’s identity, the relevant accreditation scope, report number, tested sample and report limitations; a logo by itself is not a complete verification.
Three report details deserve particular attention:
The Commission’s harmonised-standards guidance explains that standards are generally voluntary and that publication of references in the Official Journal matters for the relevant legal effect. “Newest edition” is therefore not a complete acceptance rule: check the cited reference, any restrictions and relevant transition arrangements. An older report is not automatically invalid solely because of its age.
Use a record like this at quotation review. “Open” means more evidence is needed; it does not accuse a supplier of fraud or certify the product as compliant.
On a small screen, scroll the table horizontally to see every column.
| Finding | What to request next | Procurement treatment |
|---|---|---|
| Exact model, revision and declaration scope align | Supporting assessment references and confirmation of the supplied configuration | Continue the review; identity matching alone is not final approval |
| Model suffix or hardware revision differs | Written scope explanation and relevant assessment of the differences | Keep the affected claim open |
| Only a generic “CE certificate” is provided | Signed EU DoC and the applicable assessment route | Do not substitute the generic certificate for the declaration |
| Supplier offers report summaries because full files are confidential | Document index, meaningful scope/results and an agreed review route, potentially under NDA | Evaluate whether this meets your contract and permits a credible review |
| No notified-body number appears | Check whether the applicable route actually requires a notified body | Do not reject solely for its absence |
| An IP report covers a different enclosure or installation condition | Relevant enclosure identification and test scope | Do not transfer the IP claim without a coverage basis |
| Documents are missing at a tender milestone | Follow the stated tender rules and obtain procurement/legal advice where needed | Do not assume every gap permits later correction—or always requires rejection |
Download a blank model-by-model compliance evidence register.
The record should identify an owner and a closure condition for each gap. “Ask for CE” is not an actionable follow-up; “obtain the signed declaration covering Rev B and record its scope reference” is.
Product documentation does not by itself establish that a proposed wall, roof or roadside structure can safely support the installation. Keep structural design, mounting, electrical installation and local permits in their own workstream with appropriately qualified parties.
Ask the manufacturer for the inputs those parties need: dimensions, mass, mounting interfaces, electrical requirements and relevant environmental limitations. An IP rating is evidence about enclosure protection under stated test conditions; it is not a substitute for wind-load design or a blanket guarantee for every outdoor installation.
Also establish who is acting as manufacturer, importer or other economic operator. Rebranding or modifying a product can affect those responsibilities. A service contract can allocate operational tasks, but it cannot remove legal obligations imposed on the responsible parties.
Do not use a two- or five-year warranty as the document-retention rule. The EU CE overview describes retaining the declaration and supporting technical documentation for at least ten years after market placement; confirm the exact obligations under the legislation applying to the product and the economic operator concerned.
The manufacturer must be able to provide the required evidence to competent authorities. That does not mean every buyer automatically has a right to the complete confidential technical file. Agree what documents, summaries, traceability records and access arrangements your procurement requires, and who will maintain them when the product or applicable requirements change.
There is no universal one- or two-year expiry. Review whether the declaration remains appropriate for the product and applicable requirements. Requesting a recent version can be a purchasing preference, but document age alone is not a conformity verdict.
No. FCC evidence relates to US requirements. It is not a substitute for establishing conformity with the EU legislation applicable to the offered product. Reusing underlying test evidence, where appropriate, is a different question from substituting one jurisdiction’s marking or declaration for another.
Do not assume that one particular certificate format is universally mandatory. Review the product-level conformity evidence and the supporting material/component information used to establish it, including any exemptions relied on. A generic “RoHS compliant” line without product scope leaves the evidence review incomplete.
No. This page is scoped to EU procurement. Great Britain and Northern Ireland have distinct market-access arrangements that require a destination-specific review. An EU-focused checklist should not silently be reused as a UK clearance decision.
For a Chipshow EU enquiry, send the intended destination, application and exact configuration being considered. Request the declaration scope and supporting evidence for that offer—not a general brand certificate bundle. The same review should apply to every shortlisted supplier.
A well-organised evidence pack makes the next step clear: which claims are supported, which need clarification and what must be resolved before your procurement milestone. That is more useful than a page claiming an entire product range is “verified.”
Match real venues with brand-ready experiences
Designed for:
- Reach pedestrians and nearby traffic with legible advertising in compact urban locations.
- Balance required brightness with energy use and the surrounding architecture.
Features: Pixel-Pitch Selection · Architectural Integration · Brightness & Energy Balance
Apply to: Urban DOOH · Property Advertising Screens · Building Façades
Designed for:
- Show advertising, information and branded content clearly across indoor commercial and public spaces.
- Preserve colour and contrast at close range and across wide interior sightlines.
Features: Fine Pixel Pitch · Colour Consistency · Wide Viewing Angles
Apply to: Shopping Centre Atriums · Transport Hubs · Control Rooms
Designed for:
- Configure outdoor screens around small and mid-sized stages, venues and audience layouts.
- Speed up changeovers across different venues, stage layouts and event requirements.
Features: IP65 Protection · Flexible Splicing · Efficient Handling
Apply to: Outdoor Festivals · Regional Concerts · Brand Activations
Designed for:
- Give spectators clear views of scores, replays and sponsor content throughout the venue.
- Accommodate wide seating angles, outdoor exposure and routine service requirements.
Features: Wide Viewing Angles · Outdoor Stability · Maintenance Access
Apply to: Stadium Perimeters · Scoreboards & Video Screens · Outdoor Fan Zones
Designed for:
- Provide clear views of lyrics, service content and live video across varied seating positions.
- Blend quiet LED displays into existing interiors without competing with their architectural character.
Features: High Contrast · Quiet Operation · Architectural Integration
Apply to: Historic Churches · Modern Sanctuaries · Multi-Faith Centres
Designed for:
- Improve close-range viewing of presentations, shared data and remote participants.
- Limit visual glare and operating noise in meeting and teaching spaces.
Features: Fine Pixel Pitch · Low-Glare Options · Quiet Operation
Apply to: Boardrooms · Lecture Theatres · Training Rooms
Designed for:
- Capture attention from the pavement while preserving merchandise visibility inside.
- Combine daylight visibility, transparency and a clean fit around existing shopfronts.
Features: Daylight Visibility · High Transparency · Shopfront Integration
Apply to: High-Street Shopfronts · Shopping Centre Entrances · Department Store Windows
Retail LED for EU shopping centres, flagship stores and luxury boutiques. Slim depth suits existing retail architecture; EMC Class B for mixed-use spaces.
Tender Compliant? We hold full CPR certification (No. 2531-CPR-CSC10059). Contact us for project-specific engineering and compliance docs.
Purpose-built platforms for iconic moments
P3.91
500×500 mm (Module)
Integrated Module Structure
Flexible Frame Installation
Front & Rear Maintenance
Netherlands Warehouse Stock
P8 (8 mm)
1280 × 900 × 100 mm
Player-Safe Soft Mask
1280mm Fast-Build Frame
≥3840Hz Broadcast Ready
Mixable Brightness Options
P0.78 / P0.93 / P1.25 / P1.56
600 × 337.5 × 38 mm
10-Year Parts Availability
Sustainable Repairable COB<
Fanless Silent Operation
MIP/COB Hybrid Option
P1.25 to P4.0
640 × 480 × 70 mm (Native 4:3)
Art When Off, Display When On
Bespoke Tactile Surface Textures
No-Reflection Matte Finish
100% Flush Wall-Mount Design
P1.9 / P2.6 / P2.9 / P3.9
500x500mm / 500x1000mm
8kg Single-Person Handling
Optional 7,680Hz Refresh
Integrated ESG Efficiency
P1.86 / P2.5 (SMD)
640 × 480 × 70 mm (Native 4:3)
Cost-Effective Professional Choice
Energy-Efficient Operation
Precision Die-Cast Aluminum
Native 4:3 LCD Retrofit
P2.5 / P2.6 / P2.97 / P3.91
1000/750/500(W) × 250(H) mm
Ultra-Wide Ribbon Format
Seamless 90° Pillar Wraps
Flush Wall-Mount Design
Easy Centralized Control
P2.6 / P2.9
500×500 mm
±30° Extreme Curved Locks
Soft PCB for Smooth Cylinders
Mix & Match with Straight
One-Touch Rotary Unlock
P2.5
640 × 2025 × 475 mm (Floor-standing)
ErP-Compliant Efficiency
EMC Class B Certified
Factory-Direct Quality
Cloud Cluster Synergy
3.91 mm
500 × 1000 × 85 mm
Cabinet Weight: ≤12.5kg / cabinet
Cabinet Structure: Screw Option
Refresh / Protection: 7,680Hz / IP65
Indoor (P1.9/2.6/3.9) | Outdoor (P2.9/3.9)
≤7kg (500x500) / ≤14kg (500x1000), 81mm Thick
Mechanics: 45° Cut Cabinets for 90° Angles & Curve Locks (-10° to +15°)
Refresh Rate: ≥3840Hz for Flicker-Free Visuals
P3.91 / P4.81 / P6.25 / P10.4
Up to 90%
90% See-Through Design
5kg/㎡ Heritage-Safe
0dB & ESG-Compliant
Boost DOOH Revenue
P3.91 / P4.81 / P6.25
750×1200 / 1000×1500 mm
Zero-drill setup
80% transparent
Freestanding base
Cloud sync control
P2.0 / P2.5 / P3.0 / P4.0 (SMD)
640 × 480 × 70 mm
Ultra-Light Magnesium (7.5kg)
Energy-Efficient & Fanless
100% Front Serviceable
Local EU Warehouse Stock
COB: P1.53 / P1.86
640 × 480 × 70 mm (Native 4:3)
Advanced COB Anti-Collision
Deep Black High Contrast
Native 4:3 LCD Retrofit
100% Front Serviceable
P2.6 / P2.9 / P3.9 / P4.8
500×500 mm / 500×1000 mm
Wind-Resistant Bracket
Front IP65 Protection
Tour-Ready Anti-Vibration Structure
P3.1 / P3.8
470 × 900 mm / 670 × 1300 mm
7,000nits Sunlight-Visible
IP65 All-Weather Ready
Magnesium Alloy Build
Smart Cluster Control
P4 – P16 (SMD/ICE/DIP Options)
960×960 mm (Standard)
Up to 14,000 nits
30% Energy Savings
25kg Magnesium Build
Front & Rear Service
3.91 mm
1000×1000×83.75 mm
20kg Aerospace Agility
Sunlight-Grade 6000nits
40% Faster Setup Speed
IP65 All-Weather Guard
8.93 mm
1000×1000×83.75 mm
65% Airflow Transparency
12.5kg Featherlight Rig
Wind-Engineered Safety
IP65 All-Weather Guard
P4 / P5 / P6.67
560×960×95 mm (P4/P6.67) | 600×960×95 mm (P5)
382mm Min Outer Radius
Seamless 90° Corner Splicing
Front & Rear Dual Maintenance
Zero Color Cast at Low Gray
P4 / P5 / P6.67 / P10
640×320 mm (Module)
Cabinet-Less Integrated Module
75mm Slim Wall Mount
Front & Rear Service
EU Stock & CE Approved
P15.6 / P16 / P25 (DIP High-Bright)
Variable Architectural Configurations
Zero A/C Energy Savings
<23kg/m² Historic Retrofit
7,000 Nits / Night Dimming
Front & Rear Dual Access
P4 – P16 (SMD & DIP Options)
640×960 / 960×960 / 1280×960 mm
Tailored DOOH platform
Eco-efficient operation
Slim architectural fit
Made for EU standards